Object
|
Price(ALL)
|
The extension of Fider No. 2, N / ST 110 Spitallë |
156,978,352 |
Reconstruction of the TU network in Hamallaj Sector and construction of two cabins 10 kv + Reconstruction of the TU network in Rrushkull and construction of three 10kv cabins + Reconstruction of the TU network in Hidrovor and construction of a 10kv cabin |
54,564,000 |
FDistribution network 20 kV, TU and cab by N / ST no.2 Drenovo |
52,077,574 |
Reconstruction of the cabins and construction of the TU network in the N / ST 35/6 kV Durres |
68,639,996 |