Electric Lines
434
page-template,page-template-full_width,page-template-full_width-php,page,page-id-434,page-child,parent-pageid-120,bridge-core-2.3.5,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-22.1,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-6.2.0,vc_responsive
 

Electric Lines

Other objects

Object
Price(ALL)
The extension of Fider No. 2, N / ST 110 Spitallë 156,978,352
Reconstruction of the TU network in Hamallaj Sector and construction of two cabins 10 kv + Reconstruction of the TU network in Rrushkull and construction of three 10kv cabins + Reconstruction of the TU network in Hidrovor and construction of a 10kv cabin 54,564,000
FDistribution network 20 kV, TU and cab by N / ST no.2 Drenovo 52,077,574
Reconstruction of the cabins and construction of the TU network in the N / ST 35/6 kV Durres 68,639,996